Q: Is the plant, however large, need to be covered during exterior containment?
The RRP Rule does not specifically address containment of trees or shrubs, but if dust, debris, or residue remains in the tree or shrub at the conclusion of the job, the site will not pass visual...
The RRP Rule does not specifically address containment of trees or shrubs, but if dust, debris, or residue remains in the tree or shrub at the conclusion of the job, the site will not pass visual inspection. The work practices for exterior projects are based on a performance standard -- the certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. In addition, at the end of the job, a certified renovator must perform a visual inspection to determine whether dust, debris or residue is still present on surfaces in and below the work area, including windowsills and the ground. If dust, debris or residue is present, these conditions must be eliminated and another visual inspection must be performed.