Q: How should the waste removed from the work area be stored?
Properly implemented, either option can meet the requirements of the RRP Rule. At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from...
Properly implemented, either option can meet the requirements of the RRP Rule. At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure, or behind a barrier that prevents release of dust and debris out of the work area and prevents access to dust and debris. Storing the waste in a covered waste container is one way to meet this requirement if the waste container prevents release of dust and debris. Containing the waste in closed trash bags can also prevent release of dust and debris. Locking the dumpster and placing it behind a locked barrier are good examples of ways to prevent access to the dust and debris.